DESCRIPTION:                                    

The Village of Nakusp, located on the Upper Arrow Lake, is home to approximately 1500 residents. The water system serves over 750 residences, over 100 commercial businesses, and 27 institutional or industrial customers and the water distribution network includes over 25 km of pipe.

         

In 2016 WSA was retained by the Village of Nakusp to provide engineering design and contract administration services for the replacement of 175m of water main. WSA completed the survey, design, tendering, construction management, and inspections for the project. The project was completed on time and under budget.

 

Services Provided:

  • Survey
  • Detailed Design Drawings for Construction
  • Obtaining Regulatory Approval
  • Tender Documents in MMCD Format
  • Project Management
  • Inspections
  • Record Drawings